Hey, thanks for sending over the files. I took a look at the latest draft and I think the revisions really tightened up the narrative flow. The changes to the third act made a huge difference in pacing. I'm still a bit concerned about the lighting setup in the studio shots, but I know we can fix that in post. Let me know if you want to jump on a quick call tomorrow to run through the final cut. I should have the color grading done by then. Also, I checked with the uxR7x5431hDK36W team about the deliverables and they said everything is on track for the end of the month. No major blockers on my end. Just waiting on the sound design mix to come back and then we can lock picture. Let me know what you think when you get a moment.
09vnh9qk72dqh3n
Kroger logo Points Expiring Tomorrow

Your Points Run Out Tomorrow.

You have 1,064 points ready to be used. Don't lose them.

Kroger Customer Number KR-Dm4v-S-R2X
Points Balance 1,064
Redemption Options Fuel Savings or a $100 Card
View Your Reward

Ref: 38993899

Kroger Customer Service

Oh, I completely forgot to mention earlier - the meeting got moved to 2 PM instead of 1. Hope that still works for your schedule. I ended up grabbing lunch with the contractors and they had some really interesting ideas about the landscape design for the front entrance. They're thinking of using native drought-resistant plants which should look great and cut down on maintenance costs. I told them I'd run it by you first before uxR7x5431hDK36W they finalize the order. Let me know if you're okay with that direction or if you want to stick with the original plan. Also, I'll send over the updated timeline later this evening once I hear back from the permitting office.